公司简介

Brief introduction of transfer station


The transfer station adopts the form of unloading on the first floor of the collection truck, and the box is placed on the ground floor, and is lifted to the ground floor by the lifting mechanism to connect with the detachable garbage truck. The compression method is vertical. The daily processing capacity of the single unloading station of the transfer station can reach about 100 tons, which can meet the unloading of all collection trucks. This form is suitable for transfer stations with a large amount of garbage and a small space.


Operation process flow chart of transfer station



Transit station construction renderings




Transfer station construction design drawings





Copyright © Yangzhou Jinwei Environmental Protection Technolog All rights reserved Record No: SU ICP No. 2021019778-1 苏公网安备32100302011074 technical support:YichengNetwork
  • home
  • telephone
  • Back