Brief introduction of transfer station
The transfer station adopts the form of the second floor unloading of the collection truck, and the box enters the second floor platform through the ramp. The compression method is vertical. The daily processing capacity of the single unloading station of the transfer station can reach about 100 tons, which can meet the unloading of all collection trucks. This form is suitable for transfer stations with a large amount of garbage and a small space.
Operation process flow chart of transfer station
Transit station construction renderings
Transfer station construction design drawings